69SEX久久精品国产麻豆_免费观看在线播放电视的软件大全_波少野结衣色在线_阳光姐妹淘在线观看_精东影业传媒入口_欧美又大又粗又硬又色A片_色情AV亚洲精品一区二区_麻花特开心综艺在线观看_2018手机在线a免费无码_少妇啪啪AV一区二区三区_男人J进入女人P呻吟视频免费_寂静之地在线观看_国产欧美在线亚洲一区刘亦菲_欧美多人片高潮野外做片黑人_高清H肉动漫在线观看_在线天堂中文最新版_免费观看国产短视频的方法_老婆的视频在线观看高清版_婷婷久久综合九色综合伊人色_免费不卡视频一卡二卡

Hengxiang News
— Product Selection —
  • Main codes and regulations to be followed in cold insulation design

    GB/T4272-2008 …………………………General rules of insulation technology for equipment and piping

    GB/T8175-2008 …………………………Guideline for design of insulation for equipment and piping

    GB/T8174-2008 …………………Testing and Evaluation of Thermal Insulation Effect of Equipment and Pipes

    GBJ126-89 …………………Code for Construction and Acceptance of Thermal Insulation Works for Industrial Equipment and Pipelines


  • The basic law of the selection of the thickness of cold insulation layer

    1. The greater the relative temperature of the environment, the thicker the cold insulation layer.
    2. The lower the temperature of the medium, the thicker the cold insulation layer.
    3. The higher the environmental humidity, the thicker the cold insulation layer.
    4. The larger the inner diameter of the pipeline, the thicker the cold insulation layer.
    5.The smaller the wet resistance factor of the cold insulation material, the thinner the cold insulation layer.
    6.The greater the wet resistance factor of the cold insulation material, the thinner the cold insulation layer.
    7.The greater the surface coefficient of the cold insulation material, the thinner the cold insulation layer.


  • Typical conditions for use

    1, central air conditioning chilled water supply system T=7℃ 2, central air conditioning chilled water backwater system T=12℃ 3, central air conditioning condensed water system T=18℃ 4, central air conditioning air supply system T=14℃ 5, central air conditioning host refrigeration medium low temperature system 6, refrigeration refrigeration system T=0℃ - 40℃


  • Suggested value of the thickness of air supply pipe to protect against cold and condensation
  • The air system of central air conditioning is divided into fresh air, exhaust air and return air. The parts that need to be insulated only refer to the air supply pipe and return air pipe. The temperature of the air medium sent back by the central air conditioner is generally not higher than 14℃, and its value is lower than the dew point temperature of the air conditioner. In order to prevent condensation, a cold insulation layer must be laid on the air duct. Hengxiang FUNOS sheet is the most suitable cold insulation material for the air supply and return pipes of central air conditioning.


  • Computational formula
  • Methods for calculating the volume of materials
    Plate: V = L x W xδm3
    L -- length (m) W -- width (m) δ -- thickness (m)
    Pipelien:V = (D + δ) x δ x 3.142 x L m3
    D -- inner diameter of insulation pipe (m) δ -- wall thickness of insulation pipe (m) L -- length of insulation pipe (m)

Return
主站蜘蛛池模板: 凤冈县| 什邡市| 金平| 奎屯市| 雅江县| 禹城市| 社会| 宁乡县| 晋州市| 呈贡县| 岱山县| 雅安市| 锦州市| 沾化县| 千阳县| 睢宁县| 宁远县| 乌鲁木齐市| 卓资县| 乐陵市| 都匀市| 托克逊县| 巴南区| 东乡| 镇赉县| 分宜县| 兴宁市| 九寨沟县| 南投县| 宁河县| 友谊县| 厦门市| 万安县| 宜都市| 南宁市| 巫山县| 海口市| 扶绥县| 万盛区| 红安县| 登封市|